
Logistics
From the terminal and warehouse to loading and routes: plans that respect labour law, with gains you can measure.
Forecast truck terminal workload with an explainable model and optimise shifts under labour-law constraints. See the warehouse in 3D down to the bin, place stock by CBM, load vehicles by centre of gravity and plan routes with delivery windows.
- 270hours annual overtime cap, as a constraint
- 11hours of rest enforced between shifts
- 6warehouse and shipping modules: 3D twin, CBM, loading, routing, slotting, KPIs
Live on screen
Terminal shift plan
Forecast workload is compared with staffing by hour and group; for slots that fall short, actions are ranked cheapest first and applied with planner approval.
Planning challenges in the sector
Fluctuating workload
Overnight long-haul arrivals, morning distribution, campaign and month-end waves, and extra trips announced by customers.
Shifts and labour law
11 h rest, at most 6 consecutive days, 45 h weekly and a 270 h annual overtime cap make manual planning hard.
Warehouse volume and rules
Bins run at low fill; heavy pallets sit on upper levels and ADR goods in the wrong aisle.
Loading and routing
Vehicle volume, axle-load balance, delivery sequence and time windows must be considered together.
What Oversum brings
Workload and forecasting
- Unloading, loading and cross-dock tonnage per shift; vehicles in and out and customs-bonded trucks
- Staff needs for forklift, handling and documents, never below the minimum duty crew
- Explainable forecast: weekday level × seasonal ratio + the effect of customer-announced extra trips
- 80% uncertainty band and 28-day backtested accuracy (WAPE)
Shift optimisation
- Labour-law constraints: one shift a day, 11 h rest, 6 days, 45 h weekly and 270 h annual
- Cross-skilling: forklift operators can cover handling gaps; document work stays with document staff
- Optimises cost, overtime, shortage, idle capacity and workload balance together
- Always compared with the fixed 4-team rotation on the same measures; never applied without planner approval
Scenarios and decisions
- Ready scenarios such as a campaign week, a flu outbreak or a mass truck arrival
- Actions ranked cheapest first: cross-assignment, call-in, shift extension, subcontract, inter-terminal support
- Decision log: who, when, which plan, cost and coverage
3D warehouse and CBM
- A 3D warehouse twin down to aisle, bay, level and bin, with fill, ABC, category and dead-stock views
- Rule violations: heavy pallets up high, level weight limits, ADR outside its aisle
- CBM from carton dimensions; bin capacity from cartons per pallet base and layers
- Consolidation, and empty-bin suggestions at receiving
Loading and routing
- Load Master: 3D loading for trailers, trucks and vans with support, stackability and fragile goods
- Centre of gravity within the axle range and lateral balance; door-to-cab by delivery order
- Vehicle routing with time windows (VRPTW): km, cost, on-time delivery and vehicle count
- Compared with a manual plan, with a warning when an extra vehicle is needed
Slotting and KPIs
- ABC from the last 4 weeks of pick lines; fast movers to pick faces
- Moves within a weekly budget that cut walking distance
- Warehouse use, vehicle fill, km per shipment, pick time and cost per order
- Anomaly detection with the weekday effect removed
Let us plan a demo for your industry
As a first step we define your business priorities, your data sources and a suitable unit for a pilot together.