OPAS · Part 01Representative plant · sample data

The Oversum factory · OPAS

Follow one work order through the plant. See which station the material goes to, where production is running and when the output is recorded.

One work order, the whole plant: semi-finished → line-side → assembly → slip → quality → finished stores → dispatch

  1. 1 Work order opened
  2. 2 24 housings to line-side
  3. 3 Issued to assembly
  4. 4 Production slip closed
  5. 5 Lot released
  6. 6 Into finished stores
  7. 7 Loaded on the truck
Production hall: assemblers at the benches on the left, a tote of housings on its cart in front, the aisle running to the dispatch door.

Floor plan · Choose an area

Tractor + trailer · 16.5 m · D2 Inbound truck · R1
You are at
Work order in force
Next action ·

OPAS microfilm

First frame of the film: a wide view of the assembly hall; windows on the left and people working at three assembly benches, in front a cart with a tote of housings and the line-side rack, behind the store racks and the dispatch door.

The assembly hall in a wide view: line-side store, three assembly benches and the quality point. An assembler takes the tote of housings from the line-side rack and moves to the bench; in the example 24 housings are issued to assembly, and until the slip closes the counter is live. The last scene is the quality point: the tote stands in the red-and-white hold square, and the inspector turns from the granite measuring table and rests a hand on it; recorded output 24, ready to ship 0 — the decision is taken here. The film hands over to the still of the same quality point.

IE-1042 · P-1042-01