OPAS · Part 01Representative plant · sample data
The Oversum factory · OPAS
Follow one work order through the plant. See which station the material goes to, where production is running and when the output is recorded.
One work order, the whole plant: semi-finished → line-side → assembly → slip → quality → finished stores → dispatch
- 1 Work order opened
- 2 24 housings to line-side
- 3 Issued to assembly
- 4 Production slip closed
- 5 Lot released
- 6 Into finished stores
- 7 Loaded on the truck
Floor plan · Choose an area
Loading the 3D factory…
OPAS microfilm
The assembly hall in a wide view: line-side store, three assembly benches and the quality point. An assembler takes the tote of housings from the line-side rack and moves to the bench; in the example 24 housings are issued to assembly, and until the slip closes the counter is live. The last scene is the quality point: the tote stands in the red-and-white hold square, and the inspector turns from the granite measuring table and rests a hand on it; recorded output 24, ready to ship 0 — the decision is taken here. The film hands over to the still of the same quality point.
IE-1042 · P-1042-01